Winter 2016 Improvments

No Comments

  

  

Delighted to report that all the outside seating has been recovered & the landscaping ready for spring is well underway.  A larger table is now on the terrace to ensure your coffee / wine is never far away.

A supersize new Marble table has been bought for the roof terrace – top marks to the chaps who carried that up from the street to the roof – it weighed a ton!

The full refurbishment of all the bathrooms has started & should be completed by the end of March, so watch out for some photographs of the rather more contemporary ensuites.

The top floor bedroom is always popular with its fantastic views & access onto the roof terrace, but the children always seem to secure it ….so we’ve swapped the 2 single beds & have replaced them with a monster super kingsize bed where you can relax & soak in the views.  No jokes about “how many men does it take to make a bed?”

The new permanent ( & watertight ) roof to the dining area proved very popular last year, as for most it gave a welcomed shaded area & for those of us who visit in the Off season – shelter from an occasional warm shower. The installation of 2 types of lighting means you can switch between gentle mood lighting, or much brighter to ensure you can see whose cheating at scrabble.

We hope all returning guests will welc0me & enjoy what we have done.

Look out for more improvements to come before the season starts.

Leave a Reply

Your email address will not be published. Required fields are marked *